The Florida Department of Transportation (FDOT) has acquired numerous properties in the Downtown Fort Walton Beach area in preparation for the upcoming Brooks Bridge Replacement Project. As FDOT acquires properties, the existing buildings are demolished within a short time period.
FDOT recently acquired three (3) properties on the south side of U.S. Highway 98 between Perry Avenue SE and Brooks Bridge that are currently used for public parking. The properties recently acquired by FDOT are (See Attached Map):
- 234 & 236 Miracle Strip Parkway SE (Public Parking Available)
- 240 Miracle Strip Parkway SE (City-Owned Public Parking Lot)
- 246 Miracle Strip Parkway SE (No Public Parking)
In preparation for the demolition of these properties, there will be no public parking available on these properties beginning Friday, July 8, 2022 through approximately Monday, July 25, 2022. All of these lots will be blocked off and barricaded prior to the start and through the completion of demolition.
Once demolition of these properties is completed, the areas will be opened back up for public parking until construction of the Brooks Bridge Replacement Project begins in 2023.
The City appreciates their patrons being patient through this process. Their teams are working hard to ensure a smooth transition that will have the least impact on the downtown businesses and the citizens who visit them.
Source: https://www.fwb.org/city-manager/page/brooks-bridge-construction-impacts-downtown-parking-areas